.

Tuesday, January 15, 2019

Arg Container Terminal

CARIBBEAN oceanic INSTITUTE Marine net Operations ARJ Container Terminal Prep ard by Revalino Bennett, Andrew Gibson, Jenoir Dick, Oshane Polson, Tandra Morris, Jodian Braham For Mr. Reyon McIntyre Due age zero(prenominal)ember 15th, 2012 T fitted of Contents component Page section A- GeneralIntroduction IV A-2 ARG Air layout 1-2 A-3 Abbreviations A-4 works Hrs A-5 foundation Passes A-6 General Customs formality discussion section B- Land location Operations B-1 entry Operations B-2 Terminal Access B-3 going away brass B-4 Checking activeness at Gate B-5 Inter Terminal becharm B-6 Customs solicitude theatrical role C- vas Operation C-1 Marine Requirements C-101 Working Hrs C-102 vas Arrival NoticeC-103 Documents needed C-104 Establishing intercourse C-105 Pilotage C- 2 office and Labour excogitationning C-201 Pro-forma watercraft Schedules C-202 Advance Schedules C-203 sign vas offer cultivation C-204 Detailed vas C entirely cultivation C-205 Comm unication on the port wine of Salalah Game Plan C-206 C eithers Outside Pro-forma C-207 watercraft Connections C-208 Technical selective information on the watercraft C-209 Notice of Readiness Section D- Load and tout ensemble everywheref gloomy Operation D-1 General D-101 Gantry Crane Capacity D-102 Lashing D-103 litter Cover Moves and Restows D-104 Use of Special Equipment D-105 Bay supplying and constancy CalculationsD-106 interpretation of Loading/Discharging of Containers D-107 hatching D-108 Storage D-109 information Amendment D-2 f both asleep Operation D-201 vas Profile Information D-202 Discharge List Information D-203 Checking Activity During Discharge (Tally) D-204 Reporting D-205 Short-landed Container D-206 Over-Landed Container D-3 Load Operation D-301 Pre-Plan D-302 Load List Information D-303 Re-Nomination of dispatch D-304 Pro-Forma lading Dead breeze D-305 Checking Activity during Load (Tally) D-306 Reporting D-307 Short- moveped Container D-308 Over-Shipped Container D-4 Yard size up D-5 Vessel Bunkering, Repair, and Supply of ProvisionSection E- Break Bulk and Over Dimensional incumbrance E-1 Requirements E-2 Restrictions F- take away Deliveries G- Dangerous committal H- Leakage/Spillage of Cargo I- Container Freight grade Activities J- Weighbridge K- Miscellaneous Ser debilitys L- hurt and Claims L-01 slander to Lines Equipment (Without Prejudice) L-02 Damage to Lines Vessel (Without Prejudice) L-03 Damage Ca utilise by Third Parties L-04 Damage to fashion Facilities/Equipment/Personnel M Longstanding Cargo N- Reefer Containers Section O- expression Safety and hostage O01 Rules & Regulations O02 world(prenominal) Ship and port wine tribute (ISPS) O02. ISPS Measures by fashion of Salalah O02. 2 ISPS Requirements for the Line O03 X-Ray surveillance of Containers Introduction The competition among container ports continues to increase because of di? erentiating factors such as work, repair and fulfila nce. These factors draw and quarter up some of the major key selection criterias international transferral companies consider when selecting a transshipment port. With that in mind we the owners and managers at ARJ Container Terminal forget be trying to attract carriers with our automating handling equipment, the speeding up unthe likes of services, and providing the most current data on the ? w of containers. At the alike(p) cartridge clip, however, we exit reduce cost by utilizing our resources e? ciently, including human resources, berths, container, causes, quay hold outs, and dissimilar chiliad equipment. Our key and optimum advantage entrust be our location. This location in Little Bay, Little London Westmorland Jamaica West Indies lead cause the sufficient harbor water depth and dock space that go forth make it possible to facilitate docking of up to a Super-Panamax vessel.Dredging get out not be ask to accommodate these large draft vessels, indeed no distu rbance or depletion of whatever marine wildlife sanctuaries on the take floor or natural habitat exit be ca utilise. We and our management team argon greatly transportd by this because exterior of us urgencying to take a leak an optimal towering efficiency container destination, we similarly want to know that it is done with little or no impact on the sur bikeing environment and wildlife. ARJ Container Terminal location entrust be 25 minutes from the capital city of Savanna La Mar and 5 minutes from the A2 South Coast Highway.This lead aid greatly in our multimodal transportation grooming for both our clients and ourselves and as well as compliment positively on the domestic distribution side of our spicy society. We ar a limited liability fellowship that specialises in container and general clog handling for transshipment and domestic purposes. The company is owned by Shiek Revalino Bennet, Shiek Andre Gibson and Shiek Jenoir Dick and is manage by our seniors d irectors Oshane Polson, Tandra Morris and Jodian Braham The objective of ARJ is to fork out integrated freight rate service solutions for load ships companies world good.Due to our high-pitchedly competent managers, the company leave alone be able to substantially increase its cargo employee turnover and ensure regular cargo flow, and to compliment our effectiveness we allow be the whole terminal on the island of Jamaica with Sea-Rail transshipment operations. This depart enhance our domestic power and in turn bringing first sept service to the developing nation of Jamaica. Our developed terminal infrastructure, cargo handling technologies and modern equipment pull up stakes definitely ensure ARJs competitiveness and peak position in the transit market.We go forth offer value-added services including customs operations, freight universeity and logistics solutions so this lot basi chew the faty be a one tick shop for our customers/clients. ARJ will employ 111 qual ified specia keys in different handle to ensure the companys operational efficiency and productiveness direct is on par with the major terminals around the world and even outflank if possible. We atomic number 18 predicting from global feedback that our total container flow for 2013 will be slightly 750,000 TEU. ARJ Air Layout Infrastructure location Length 290 m Draught 15 m W arhouse bea 16,310 m2Open-air retention eye socket 120,800 m2 Technical equipment Quay hold outs at the vessel STS crane stuffy quay crane Mobile harbor crane For container transfer (horizontal transport) SC (max. stacking capability 1-over-3-high) Reachstacker Terminal tractor with t vituperateer (so-called Tractor-T racetracker Unit (TTU)) Multi-trailer (terminal tractors with several(prenominal) trailers) Empty/ blameed container handler Shuttle Carrier (ShC stacking capability 1-over-1-high) machine-controlled Guided Vehicles (AGV) Automated SC (max. stacking capability 1-over-2 -high) For container transport and stacking in spite of appearance the metre SC Rubber-Tyred Gantry crane (RTG crane) Rail-Mounted Gantry crane (RMG crane) Container handler (like relieve oneselfstacker or top lifter) OverHead Bridge crane (OHB crane) For the landside operation SC RTG crane RMG crane Reachstacker TTU At the inland navigation vessel STS crane Conventional quay crane Mobile harbor crane The STS crane drops cut containers on TTU that will transport the containers to the stacking bea where the boxes ar stacked by reach stackers (see descriptor 1. 1) or forklift trucks fitted with appropriate spreader frames for container top or side lifting.Due to their versatility in operation, reach stackers be the best choice for our multi-purpose terminal as they be easy to handle, can be used for stacking in the g-force, lade and un fill up of TTUs, road trucks and rail cars on first rail. Including our landside operation, an estimate of 34 reachstackers a nd 45 TTUs are needed per STS crane. The specific ac search of TTUs in bumpicular will wager on the hold amongst the berth and the stacking area of the respective operation. The TTUs are used for the transport of the containers in the midst of the vessel and the container yard.Figure 1. 1- Reachstackers and TTU operation A storage energy of approx. 350 TEU per hectare for 3-high stacking and 500 TEU per hectare for 4-high stacking are common figures for our graphic symbol of yard equipment. The maximum stacking height is 5, container overeats can be kept 4-deep due to second row access. In vitrine of re delimittlement of capacities reachstackers are easily transported to an new(prenominal) terminal or used for former(a) cargo handling and because of their easy transportation surrounded by terminals reachstackers can be used to cover temporary indispensabilitys. place Carrier governing bodyThe STS crane will place containers onto the apron from where the SCs transport them to the stacking yard (see Figure 1. 2 and Figure 1. 3) and stack the containers. The SCs are independent from any some different equipment and are able to perform all the different handling operations transport, stacking and the freight rate/ set down of trucks and rail cars (see Figure 1. 3). SC constitutions are the optimal carcass for large size terminals when high flexibility in the yard and accessibility of the boxes are required and thay make it easy to alter the layout of the terminal.A storage capacitance of approx. 500 TEU per hectare stacking 2-high (3-high SC) and 750 TEU per hectare stacking 3-high (4-high SC) can be achieved. The maximum stacking height is 4-high. Including landside operation, an estimate of 45 SCs are required per STS crane without considering specific powers. The system will be supported by container handlers stacking MT boxes and/or RMGs for container handling in the rail yard. Figure 1. 2 Pure SC system Figure 1. 3 SC operations Conta iner transport and stacking and Loading / un shipment of rail cars System advantages SCs are able to cover all kinds of horizontal and vertical transports being necessary to perform container moves from the landside terminal interfaces (including truck handling and rail operation) via the container yard to handover positions below the STS cranes at quayside (and vice versa). the containers can be dropped on the ground so that no (or sole(prenominal) short) time lag times for handling equipment occur. This kind of container handover enables STS cranes to operate with a high productivity spot using a comparatively low number of SCs per crane. high number of concurrent container movements the breakdown of one SC has a comparatively low impact on the total handling process compared to the systems with TTUs the push party costs are lower due to the smaller number of vehicles no disturbance of the operation by trucks because these are loaded/unloaded outside the stacking yard th e system is flexible to changes based on operational requirements and terminal layouts can be simply altered as SCs can be easily moved within the terminal since no pre-set routes or tracks are needed Rubber-Tyred Gantry Crane System with Tractor-Trailer UnitsThe STS gantry crane places the container on a TTU unit that transports the container to the storage area where the RTG crane stacks the containers in long blocks (see Figure 1. 4). The RTG can be used for TTUs and road trucks as well. The size and structure of the RTG crane is determined according to the requirements of the terminal operator. The system has a very high stacking assiduousness because of the high stacking capability and the block stacking. Long traveling distances on the terminal are less problematical as TTUs transport the containers.RTG cranes will also be effectively used for the handling of containers on road trucks or rail cars. According to manufacturers, up to four tracks can be covered and containers c an be stored at the side of the rail tracks. They can be allocated from the yard to the landside operation and vice versa, if necessary. Including landside operation 23 RTGs and 45 TTUss (depending on the distance amidst berth and stacking area) are required per STS crane. They stack the container in blocks 1-over-4- to -7-high and 5 to 8 container rows plus 1 lane for container handover laneFigure 1. 4 RTG cranes and TTUs in the stacking yard, rail yard operation by RMGs System advantages low space requirement in the stacking area because of the high storage capacity in a small area (high stacking density). The containers can be stacked up to 8- high (i. e. 1-over-7-high)1 without spacing for traveling lanes between the rows. relatively high flexibility as the RTGs can be transported to early(a) storage blocks Rail-Mounted Gantry Crane System These cranes are mounted on fixed rail tracks with a jut out outside the portal of cranes (see Figure 1. ). Figure 1. 5 RMG cranes with TTUs System advantages RMGs in the main stack higher and span wider, with up to 1-over-7-high and 12 containers wide Stacking density of the yard is higher with RMG cranes and can exceed 1,000 TEU per hectare (stacking 4-high) Automated Guided Vehicles The horizontal transport of the containers will be performed with AGVs. (See Figure 1. 6). The handover positions for trucks are located at the top-end of the stacking blocks. The stacking of the containers is usually carried out by automated RMGs.The ShC is designed primarily to work containers between the shipss side and container stacks served by RMG cranes. As it is able to stack containers two high it will also be used for load and unloading road trucks and rail cars. The shuttle carrier is an substitute(a) aim at more efficiency to handle the container transport between the stacks and the quay cranes, and s bank maintain high density stacking by RTG or RMG yard cranes. Figure 1. 6 RMG cranes with AGVs System advantages ver y low labor costs because of automation high system accessibility very high productivity of horizontal transport The layout and choice of our equipment and their interface will depend on, amongst others, the number of containers to be handled, accessible area type of back country transport. The combining of our terminal equipment to be used will depend on if they are at the vessel, for transport tasks between quay and stacking yard ( or reverse) for container stacking, for transport from stacking yard to and from the landside operation area for landside operation itselfOperational areas 1. The area between quay wall and container yard 2. container yard 3. terminal area of landside operations example the gate, parking, office buildings, customs facilities etc The container yard will be an intermediate storage forwardness significance the containers will remain from a couple of hours to some weeks. There are different possibilities for the layout of our intermediate stor age area. We may have stacking area which is compact, low ground area consuming stack without spacing known as block stack (see Figure 2. 1).In cases like these, yard gantry cranes will be used for the stacking of containers being delivered by terminal equipment of horizontal transport. An choice is the bi business concernar stack (see Figure 2. 2) where the containers are stacked by Straddle Carriers (SC). This type of stacking will have spacing between the container rows and relatively wide terminal roads. Export and import containers will be segregated within the yard area and piled up to 4 containers high and pre-sorted for the various hinterland transport modes. Figure 2. 1 block stacking Figure 2. 2 originar stackingOperational procedures applicable for the handling of containers and container vessels calling at the ARJ Container Terminal Section A General A-1 Abbreviations COD Change of Destination EDI Electronic entropy trans aimt EIR Equipment Interchange Report ETC Ex pected Time of Completion OOG Out of count on fuel pod mien of Discharge SSDR Stevedore Ship Damage Report TOS Terminal Operating System A-2 Working Hrs The terminal operates round the clock on the hobby memorandum Terminal Operations 24 hrs overleap say public holiold ageOffice Administration 0700 hrs to 1530 hrs Monday to Friday except declared public holidays Gate Operations 0800 hrs to 1600 hrs Friday except declared public holidays Overtime rates as per Tariff will apply for all activities carried out on declared public holidays. Containers can be pass judgment at or released from the gate outside the working hrs shown above at no excess charge (except on public holidays), but former notice should be habituated to the manner to ensure the Gate is staffed appropriately. A-3 Entry Passes enduring entry passes are bangd at the discretion of the Sr.Manager. Application forms are available at the main reception of the Container Terminal Administration Building. Permane nt entry passes are valid for one year. Monthly & routine entry passes are issued takings to proof of legitimate business in the terminal. Vehicle entry permits are selectively issued on providing vehicle enrolment and accommodation papers. A-4 General Customs Formalities The expatriation telephone wire bears just responsibility for all Customs headway formalities concerning their cargo. Section B Landside Operations B-1 Terminal AccessARJ Container Terminal controls access of truckers to the terminal. A trucker is only allowed on the terminal subsequently full identification of the trucker and registration of the terminal visit. Containers are only allowed onto the terminal on instruction of the tape transport line that has to provide an acceptance notification to ARJ Gate subdivision in the lead the container arrives at the gate. Information required will be as follows Container ID and fight No. Equipment Size/Type Outbound Vessel / Voyage and POD IMO / Reefer / OOG When delivering the container the trucker has to provide Container No. nd Booking No. to gate staff. All full containers will be gated in put down to clearance of Customs formalities by the tape drive line. B-2 Exit Validation ARJ performs exit validation. Containers are only allowed to leave the terminal upon release book of instructions sure from the merchant vessels line, provided the customs department does not restrict the container from divergence the terminal. The transit line must provide ARJ Gate discussion section with a hard copy of the release instruction. Information required will be as follows Container ID Receiving Party Identification or Reference Number Date Restrictions if any Full containers will be allowed to depart the terminal only subject to conclusion of all customs formalities by the transportation system line and full payment of port charges. B-3 Checking Activity at Gate For any containers entering or leaving the gate, the larboard will perform a visual keep back and any deviations from provided data or anomalies are documented and account to the shipping line. The let out entangles the following Container ID Equipment size/type optic damage (external) Visual damage (internal empty containers only) Presence of blockadeIf any damage to a container is noticed at the gate, then a pen to this will be do on the gate ticket issued. every just run offing required e. g. Seal number, or further action like placing of postage stamp or placard is indictable as per Tariff. B-5 Customs Inspection In case ROP orders customs inspection of a container, shipping line should advise the port who will move the container to the customs inspection area and unstuff the cargo as per ROP requirement and subsequently restuff the cargo in the container, such operation to be charged as per Tariff.Section C Vessel Operation Information on vessels calling ARJ to realise or load containers is to be provided to ARJ planning d epartment by the shipping line or its designated representatives. The Line shall nominate a focal point that can be reached 24 hrs a day by ARJ intend and Operations segments in case any issues concerning Vessel proviso / Operation need to be verified. C-1 Vessel Arrival Notice The owner, ships agents or the overwhelm of the ship shall send the comer notice to the Harbour Master 48 hrs beforehand arrival to the Port.He should also inform the Harbour Master with the flesh out of the Ship, its cargo, any hazardous cargo, cases of illness and any defects which affects the vessel manoeuvrability. C-1. 1 Documents Required Insurance cover for third party liabilities, wreck removal and anoint pollution Ships registration certificate Port clearance certificate from last port of call ISPS present Class Certificate C-1. 2 Establishing Communication The master of the ship shall establish communication with The Port self-assurance and pick up permission to enter the port limits , at to the lowest degree(prenominal) four hrs former to the estimated time of arrival.The Port Authority will typeset the services of Pilotage, Tugs and Mooring Gang(s), and coordinate with ARJ Terminal Operations to have the gantry cranes and labour gangs ready. Normally cargo operations start upon lowering of the aisle from the vessel. C-1. 3 Pilotage Pilotage services are available round the clock. Activation time for marine services is 30 minutes. C- 2 Berth and Labour mean Pro-forma vessel schedules and move counts declared by the l shipping lines form the basis for berth and stevedore / labour planning in the Quay Wall Schedule.Daily berth planning will also include Initial vessel call study Detailed vessel call information for initial and pro-forma calls Availability of quay-wall space Vessel connections Based on this information ARJ Planning department will prepare the day plan C-2. 1 Pro-forma Vessel Schedules Vessel string pro-forma berth windows are negotiated between the shipping line and ARJ. Berth windows are related to an estimated number of container lifts and the required day and time of the week for the vessel operation.Unless other agreed, vessels will be be after for arrival and departure at pro-forma berth window. Vessels arriving within pro-forma eternally have priority over vessels out of pro-forma or incidental vessel calls. If it concerns vessels of the same shipping line only, this shipping line may set its own priorities, provided that it does not impact the berth windows of other Shipping lines. C-2. 2 Advance Schedules The shipping line will provide to ARJ Planning Department future projected schedules every week, from current date to 30 days in advance.Information required will be as follows Vessel reach incoming / Outbound Voyage ETA / ETD Service C-2. 3 Initial Vessel Call Information The shipping line is trusty for providing initial vessel call information at least 7 work-days prior to the estimated vessel arrival date to ARJ Planning Department. Information required will be as follows Vessel Name Call Sign Inbound / Outbound Voyage ETA / ETD LOA Previous Port of Call neighboring Port of Call Estimated Move Count Vessel Service Vessel Operator C-2. 4 Detailed Vessel Call InformationDetailed information is to be provided to ARJ Planning Department for line haul vessels at least 48 hrs and for all other vessels at least 24 hrs prior arrival at the terminal. Information required will be as follows Vessel Name ETA Required ETD Expected Move Count, split as Total number of discharge / load moves OOG discharge / load moves sustain reefer discharge / load moves Empty container discharge / load moves IMO class 1 & 7 discharge / load moves Detailed information of any Break Bulk Cargo Upon receipt of this information, ARJ will encounter the final berth and labour planning.In case of required changes in the put across ETA / ETD, ARG Planning Department will contact th e shipping line to create the best workable solution. The Port has a minimum billing per vessel call for loading/discharging of containers as per Tariff. Vessels are expected to use the Ports coast gantry cranes. any(prenominal) movement or use of the vessels gear while alongside is strictly subject to prior approval from the Port. C-2. 5 Communication on the ARJ Day Plan The Line will submit day-by-day ETA update for their vessels latest at 1000 hrs every day. ARJ will in turn revert with a Day Plan latest at 1500 hrs.In order to provide flexibility to our customers, the Day Plan is invariably considered subject to change. any agreements that are verbal in nature or those made after office hrs need to be confirm in writing in a flash on opening of the next working day. C-2. 7 Vessel Connections Connections other than those agreed to in the pro-forma schedule, have to form part of the Day Plan negotiations and these have to be announced to ARJ Planning Department preferably 48 hrs, but at least 24 hrs before ETA to ensure proper priority setting for the quay-wall. C-2. 8 Technical Information on the VesselFor vessels calling ARJ Container Terminal for the first time or in case of changes to the previously supplied vessel information the shipping line require to supply ARJ Planning Department with technical information on the vessel at least 72 hrs before arrival. Technical information on the vessel consists of Vessel Name Call Sign LOA Container Layout Lashing Plan Type of Twist Locks Type of insure Covers Mooring Restrictions (port / starboard side) Vessel Capacity in TEU Vessel Profile / NSD file (if available) Other peculiarities germane(predicate) to the Vessel storage roomFurther details subject to planning or operational require have to be provided upon request. C-2. 9 Notice of Readiness The Port Authority will issue the vessel with a Notice of Readiness at least 2 hrs prior to the estimated completion of cargo operations, and provi ded vessel confirms readiness to canvas upon cargo completion The Port Authority will arrange to criminal record Pilot, Tugs and unmooring gang(s). Section D Load and Discharge Operation D-1 General D-1. 1 Gantry Crane Capacity Port provides shore-side gantry cranes with minimum capacity of 40 tons under the spreader and there are cranes with up to 65 tons capacity.D-1. 2 Lashing The Port Tariff for loading and discharging of containers includes the cost of flogging and un lash of containers on board the vessel. Lashing equipment is to be provided by the shipping line. The Port will maintain safe housekeeping of flogging material at all times and handle all thrashing gear in a controlled manner and in accordance with accepted safety standards. The Port will also handle discharging and loading of lashing material if required at no additional charge. D-1. 3 Hatch Cover Moves and Restows Hatch Cover moves and restows are chargeable as per tariff. D-1. 4 Use of Special EquipmentUs e of special equipment for loading/unloading eg slings, frames etc is chargeable as per tariff on per lift basis. D-1. 5 Bay Planning and Stability Calculations The Port will carry out Bay Planning and unloading / sequence of containers in accordance with the information provided by the shipping line as part of its normal service. Container stow plans prepared by the Port are subject to the final confirmation by the Master of the vessel. The Port is responsible for providing information to the shipping line required for stability and lashing calculations, but the Port is not responsible for making these calculations.D-1. 6 description of Loading/Discharging of Containers Loading / discharging of containers is the handling by the Port of the containers between the stowage position onboard the vessel and the position in the container yard of the Port. No additional breaks made based on any change in the information or additional information provided by the shipping line are include d, and such additional shiftings made are chargeable as per tariff. logical implication / export containers pay truck loading / unloading charge as per tariff. D-1. 7 ReportingThe Port makes reports as per shipping lines required format and frequence to the operator of the vessel for all containers loaded/discharged and in case of vessels loading containers be to more than one shipping line, to each shipping line for their containers. D-1. 8 Storage Containers are stored in the Container Yard of the Port subject to the applicable Freetime and Container Storage rates as per Tariff. D-1. 9 Data Amendment Data Amendment charges as per Tariff apply in case the discharge and / or load adverts are not provided in time to the Port, or in case there is any change to the information provided.Any Data Amendment that involves containers being shifted from one stack to another will incur shifting charges in addition as per Tariff. D-2 Discharge Operation D-2. 1 Vessel Profile Information Th e shipping line is responsible for communicating the discharge, re-stow and remain-on-board instructions at least 24 hrs prior to the arrival of the vessel to ARJ Planning Department. For vessels with less than 24 hrs steaming time from the previous port, these details are to be provided as soon as information becomes available. The Bay-plan of the arriving vessel is to be sent via EDI message.D-2. 2 Discharge List Information The discharge list is to be provided to ARG Planning Department 24 hrs prior arrival for set about vessels and 18 hrs prior arrival for feeder vessels. Exceptions will be made on a case to case basis for vessels with lesser time as compared to these deadlines in which case load instructions have to be made available as soon as possible. D-2. 3 Checking Activity During Discharge (Tally) During the discharge process, ARJ will perform a visual check and any deviations from provided data or anomalies are documented and describe to the Line.This check also covers any restows. The check includes the following Container ID Equipment Size / Type Visual Damage Presence of seal (On request) Any further checking required eg Seal number, CSC plate validity etc or further action like placing of seal or placard is chargeable as per Tariff. D-2. 5 Short-landed Container When a container is reported short-landed, ARJ Planning Department will contact the Line. Information will be provided as follows Container ID Vessel / Voyage stowage position stated for the container Reasons for Short-LandingContainer Terminal Operational Guidelines Issued 1 D-2. 6 Over-Landed Container When a container(s) is reported as over-landed, ARJ Planning Department will contact the vessel operator. Information will be provided as follows Container ID Seal Number Status (full / empty) Equipment Type / Size Stowage amaze the container was found in IMO / Reefer information as further as possible Reasons for Over-landing The shipping line will investigate will power / operator of the container and decide whether the container must be re-stowed or remain discharged.The shipping line will supply full container details to ARJ Planning Department and advise further action before vessel departure. D-3. 3 Re-Nomination of Cargo In the event of rollover of cargo for whatever reason, the Line is expected, within 12 hrs of vessel departure, to communicate to ARJ Planning Department, the name of the new vessel which will load the cargo. Every such renomination incurs a charge as per Tariff. D-3. 4 Pro-Forma Cargo Deadline In principle, all containers must be in the yard upon arrival of the vessel in order to maintain vessel schedule integrity and ensure efficient stevedore operations.The following will be taken into account Vessel schedule reliability / integrity should not be affected Berth / Crane productivity should not be unduly impacted Line, Port and Customs requirements The shipping line is responsible for ensuring that all cargo is avail able for loading prior vessel arrival. selfsame(prenominal) applies to cargo on hold or any other cargo released by the shipping line but not ready for loading due to any particular reason. D-3. 5 Checking Activity during Load (Tally) During the load process, ARJ will perform a visual check and any discrepancies or anomalies are documented and reported to the shipping line.This check includes restows. The check includes the following Stowage Position Visual Damage Presence of Seal Any further checking required eg Seal number, CSC plate validity etc or further action like placing of seal or placard is chargeable as per Tariff. D-3. 6 Reporting ARJ Planning Department will update the shipping line with the ETC before and after start of vessel operation and advice the vessel and The Port Authority 2 hrs notice prior to vessel departure. at one time vessel planning is removed ARJ will forward a BAPLIE to the vessel.An updated BAPLIE will be delivered minimum 1/2 hour before comple tion of cargo operations. ARJ is able to provide the shipping line with EDI Load handicap Messages (COARRI) at frequencies agreed to with the shipping line. In addition to the EDI information a recap of the final load and a confirmed load list (CLL) will be sent to the Shipping line via E-mail earliest after vessel departure. In case of EDI failure ARJ will provide the shipping line with a Bay Plan of the load condition upon request.Any urgent or critical matters relating to discrepancies in reporting are to be addressed with the ARJ Planning Department D-3. 7 Short-Shipped Container When a container is reported as short-shipped, ARJ Planning Department will contact the shipping line. Information will be provided as follows Container ID Vessel / Voyage Port of Discharge Stowage position stated for the container Reasons for Short-Shipping D-3. 8 Over-Shipped Container When a container is reported as over-shipped, ARJ Planning Department will contact the shipping line.Informati on will be provided as follows Container ID Vessel / Voyage Container Operator for the over-shipped container Status (full / empty) Category (export / transhipment) Stowage Position (if available) IMO Details Reefer Details Reasons for Over-Shipping D-4 Yard Inventory ARJ Planning Department will provide the shipping line with weekly Yard Inventory Reports for all laden and empty containers. In addition ARJ will also provide on a weekly basis a list of laden containers in the yard, which do not have a put up on carrying vessel or POD.The shipping line will confirm the missing details and revert with an update within 24 hrs of having received the input from ARJ. Any re-nomination or COD is chargeable as per Tariff. D-5 Vessel Bunkering, Repair, and Supply of Provision Vessel bunkering, repair and provisioning activities have to be communicated to ARJ Planning Department at least 48 hrs before arrival of the vessel. These activities are only allowed after approval of ARJ an d are subject to safety and earnest procedures issued by the Port.These activities should not delay the vessel stevedoring operation and must be completed within the operational working time of the vessel unless otherwise agreed. Only in exceptional(a) cases may the stevedoring operations be stop or the vessel port time extended because of these activities. Section E Break Bulk and Over Dimensional Cargo E-1 Requirements The Shipping line is expected to provide information at least 48 hrs in advance of the vessel arrival to the ARJ Planning and Operations Department on any break-bulk activity on vessels that is planned at ARJThe following Information has to be provided Arrival / Ongoing transportation via water / via land manipulation by Container Gantry Crane / External Crane Piece count Measurements Cargo Description Weight Position on Vessel pure(a) description including sketches, diagrams, photographs etc in jpeg / bmp format Customs Approval Confirmation For over dimensional unitised cargo, the shipping line is expected to provide a complete Out of Gauge manifest as part of the documentation submitted for a vessel call.Undeclared, wrongly declared, poorly stowed or incorrectly packaged break-bulk or over dimensional cargo is subject to a fine as per Tariff. Port has the option of measuring and/or weighing the cargo to check the measurements and/or weight. The Port will provide warehouse for storing this cargo if required at no additional charge subject to availability. Any other equipment required for yard handling will be chargeable as per Tariff. Loading or Discharging and Quay Handling will be charged as per the applicable charges of the Tariff.Free time will apply as per the tariff for over dimensional containers, and storage charges will apply as per the tariff for over dimensional containers based on the length. E-2 Restrictions Waterside handling restrictions are always subject to specific approval from ARG Planning and Operations Dep artments but approximately are as under Dimensions Height Length Width Weight 10 m 18 m 6 m 65 MT Shipping lines are expected to taken to take approval from the terminal prior acceptance of bookings involving break-bulk and over dimensional cargoes.Section F Direct Deliveries For exceptional cases there exists a possibility for accepting or delivering containers under the twitch for direct loading / discharging. For safety reasons this activity will have to conform to with ARJ Rules and Regulations. The Port should be advised at least 24 hrs before the arrival of the vessel at the Pilot put up of any planned direct address containers. The following information should be provided Container ID Time of delivery Contents of the container Hazardous Details (IMO Class, UN No. and Manifests as required Port of Salalah will inform the Line about the expected time of loading or discharge of the container. The requested direct delivery has to be confirmed to ARJ three (3) hrs before arrival of the vessel. Section G Dangerous Cargo The shipping line bears the full responsibility for compliance to all rules and regulations governing the handling and transportation of Dangerous Cargo. Packing, labeling, declaration, stowage and documentation have to watch over with the IMDG Rules and Regulations for Sea Containers as well as local laws and any directions given by local and Port Authorities.The Dangerous Cargo Manifest has to be provided to ARJ Planning Department at least 24 hrs before vessel arrival. The Line is responsible for content and sufficiency of the manifest. ARG will stow breakneck cargo container on the vessel as per instructions from the Line. Dangerous cargo containers pay additional charges for loading and discharging as per Tariff. Handling dangerous goods containers belonging to IMO classes 1 and 7 require special attention and permissions from the terminal and other competent authorities.Dangerous cargoes requiring special handling will be ent itled to cut down free-time as compared to normal containers and will be subject to separate storage rates as per Tariff. Section H Leakage / Spillage of Cargo Leakage of cargo contents from a container can be reported either by the shipping line on receiving information from the vessel or by ARJ staff while they are handling it in the terminal. On being made aware of a leakage, the shipping line will immediately advise its nominated surveyor to carry out a survey of the leaking container in conjunction with ARJ Health, Safety, warrantor Environment Department.On receiving the surveyors report, the shipping line will be responsible for taking necessary travel to arrange for re-packing of cargo through third party contractors or alternatively for cross-stuffing of cargoes, as per the advice received from the surveyor. Onward movement of such cargo from ARJ will be strictly subject to clearance from ARJ, that the leakage has been stopped and container is cargo and sea worthy for onward transport. Spillage of cargo will be solely on account of the shipping line as will a penalty charge applied as per tariff till corrective action is taken to stop the leakage.Section I Container Freight Station Activities ARJ has capabilities for container cargo rework, cross stuffing and CFS activities. Arrangements can be made via the CFS Co-ordinator. Section J Weighbridge Port has a weighbridge and shipping line can issue instructions for any container to be weighed at charges as per tariff. Section K Miscellaneous Services Port can offer various services such as sweeping containers, fitting or removing tarpaulins, knocking down ends of flatbeds, bundling flatbed containers, applying or removing placards, fixing seals etc, all of which are chargeable as per tariff.Section L Damage and Claims The Damage Claims Section of ARJ is responsible for relations with damages caused to the shipping lines equipment, its vessels or to port facilities, equipment or its personnel. L-3 Damage Caused by Third Parties If damage is caused to containers or vessels by parties other than ARJ, then ARJ will undertake repairs only at the specific request of the shipping line at its risk and account. L-4 Damage to Port Facilities/Equipment/PersonnelThe shipping line will be richly responsible for all costs and consequence arising due to any damage caused by it, to port facilities, equipment or personnel. Section M Longstanding Cargo Consignments remaining in the port in excess of the following periods will be subject to auction. Any cargo, for which the respective Port and Customs charges have not been paid will be considered frustrated and may be auctioned and sold by ARJ after the following time periods One Month Refrigerated Containerized Cargo and other cargo considered perishable Three Months All other Containerized Cargo Section N Reefer Containers Live reefers will be plugged and unplugged as a standard activity in the stevedoring operations subject to av ailability of connections, at the temperature setting advised by the Line. Reefer supervise and fear is carried out by the Container Service section of the Maintenance Services Department, and is chargeable as per tariff (charge includes electric supply). Monitoring of reefer containers is carried out at least every 8 hrs and any faults will be immediately reported to the Line.Export reefers can be pre-cooled if required and electric supply/monitoring charges commence from the time of plug-in. The Port can arrange PTI (Pre-Trip Inspection) of reefer containers and also can retrieve temperature data from the reefer data logger, both activities chargeable as per Tariff. Section O Port Safety and Security O-1 Rules Regulations The Port of Salalah Rules Regulations is issued by the Port Authorities and applies to all users of the Port. The complete document is available on the Port of Salalah Website. Container Terminal Operational Guidelines Issued 1 stMarch 2007 30 O-2 Internatio nal Ship and Port Security (ISPS) The Port of Salalah is certified as fully compliant with all requirements laid down under the International Ship and Port Facility Security Code (ISPS). All vessel operators are expected to fulfil requirements pertaining to their role as specified in the ISPS Code. O-2. 1 ISPS Measures by Port of Salalah Port of Salalah has designated a Port Facility Security Officer (PFSO) and a Deputy PFSO (DPFSO) as point of contact for all issues pertaining to ISPS rules and regulations for the Port of Salalah. O-2. 2 ISPS Requirements for the Line Shipping Agents must submit ISPS vessel certification, ETA of the vessel, Crew list, estimated port stay and last 10 ports of calls to the Port conceal 48 hrs prior to vessel arrival. This information is to be sent to email& one hundred sixtyprotected com The Ships Security Officer must submit a completed firmness of purpose of Security (DOS) of the vessel through the shipping agent to the Port Security Officer for endorsement upon berthing. Enquiries on the Port Security Level are to be directed to HSSE department. All users of port facilities must display facility passes at all times while at the facility.To apply for pass, please contact the HSSE department Port users must stop at all facility access control for Security check. Any violation will result in rejection of facility access For further information / illumination please feel free to contact the Port Facility Security Officer. Tel. 968 23219500 ext 466 / 409 / 406 O-3 X-Ray Inspection of Containers Port of Salalah has modern X-Ray screening facilities, and in case any container is required to be screened, the Line should advise the Port who will make the necessary arrangements, which is chargeable as per Tariff.

No comments:

Post a Comment